Flyover Design


2.9 بواسطة Kendalisodo
11/09/2020 الإصدارات القديمة

Flyover Designحول

اختيار وجسر وأعلى جودة

The elevated bridge is a construction or building that serves to connect two parts of the road that are cut off by the obstacles such as deep valleys, river channels, lakes, irrigation channels, railways, highways that are not even a plane even the ocean.

Cast casting process using pre-stacked concrete begins with preparing a rough aggregate first. Next do the grouting / grout colodial work. Then the grout is mixed with sand, cement, and water to taste. Some also add additives such as plasticizer on a special stirrer.

Implementation of this method is very advantageous arabica casting process using a medium concrete mixture with an aggregate size of less than 40 mm. You can take advantage of additives that can increase the power of the concrete masonry mixture. The advantages of this casting technique by pumping, among others, can save the project cost budget plan (RAB), the need for a small workforce, the results are directly proportional to the initial preparation, and the level of productivity of the work was easily increased by increasing the pump capacity and improve the quality of the results.

Thank you

معلومات أكثر ل تطبيق

احدث اصدار

2.9

محمل

Kandee Kimochii

Android متطلبات النظام

Android 2.3.2+

الإبلاغ

تحديد كغير مناسب

عرض المزيد

Use APKPure App

Get Flyover Design old version APK for Android

تحميل

Use APKPure App

Get Flyover Design old version APK for Android

تحميل

Flyover Design البديل

احصل على المزيد Kendalisodo

الاكتشاف